{"id":23349,"date":"2026-08-03T02:31:56","date_gmt":"2026-08-03T02:31:56","guid":{"rendered":"https:\/\/alv-solar.com\/?p=23349"},"modified":"2026-08-03T02:31:58","modified_gmt":"2026-08-03T02:31:58","slug":"how-to-choose-the-right-solar-mounting-system","status":"publish","type":"post","link":"https:\/\/alv-solar.com\/ru\/how-to-choose-the-right-solar-mounting-system\/","title":{"rendered":"How to Choose the Right Solar Mounting System for Your Project in 2026"},"content":{"rendered":"<p><strong>Last Updated:<\/strong>\u00a0August 3rd,2026<\/p>\n\n\n\n<p><strong>Author:<\/strong>\u00a0<strong><a href=\"http:\/\/www.linkedin.com\/in\/devi-huang-560856422\" target=\"_blank\" rel=\"noopener\"><mark class=\"has-inline-color has-luminous-vivid-amber-color\">Devi Huang<\/mark><\/a> | International Sales Team, <a href=\"https:\/\/alv-solar.com\"><mark class=\"has-inline-color has-vivid-green-cyan-color\">\u0410\u041b\u0412<\/mark><\/a><\/strong><\/p>\n\n\n\n<p>Devi Huang is part of the international sales team at ALV, a manufacturer of solar mounting systems and aluminum profiles. She works with EPC contractors, distributors, and project developers worldwide, helping customers choose the right mounting solutions based on project requirements, local standards, and budget.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>How to Choose the Right Solar Mounting System for Your Project in 2026<\/strong><strong><\/strong><\/h1>\n\n\n\n<p><strong>Choosing the right solar mounting system depends on your project type, roof structure, environmental conditions, and local engineering standards\u2014not simply on price.<\/strong>&nbsp;A properly designed mounting system improves structural safety, reduces installation time, and helps ensure your solar power plant operates reliably for more than 25 years.<\/p>\n\n\n\n<p>As the global solar industry continues to expand, selecting the right mounting solution has become increasingly important. According to the <a href=\"https:\/\/www.iea.org\/reports\/global-energy-review-2026\/technology-solar-pv-and-wind\" target=\"_blank\" rel=\"noopener\"><strong><mark class=\"has-inline-color has-vivid-cyan-blue-color\">International Energy Agency (IEA)<\/mark><\/strong><\/a>, global renewable energy capacity additions reached a record <strong>800 GW in 2025<\/strong>, with <strong>solar PV accounting for more than three-quarters of all new renewable capacity additions<\/strong>. The IEA also forecasts that solar PV will contribute <strong>nearly 80% of global renewable capacity growth through 2030<\/strong>. These trends make long-lasting, reliable mounting systems more important than ever for project success.<\/p>\n\n\n\n<p>Whether you are planning a residential rooftop installation, a commercial solar project, or a utility-scale solar farm, understanding the key selection criteria will help you reduce lifecycle costs and maximize system performance.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Why Is Choosing the Right Solar Mounting System Important?<\/strong><strong><\/strong><\/h1>\n\n\n\n<p>Solar modules typically carry performance warranties of <strong>25\u201330 years<\/strong>, meaning the mounting structure is expected to perform for the same period. An improperly designed mounting system may lead to corrosion, excessive structural movement, installation delays, or higher maintenance costs.<\/p>\n\n\n\n<p>A high-quality mounting system should provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Reliable structural support<\/li>\n\n\n\n<li>Long-term corrosion resistance<\/li>\n\n\n\n<li>Fast and efficient installation<\/li>\n\n\n\n<li>Compatibility with different PV modules<\/li>\n\n\n\n<li>Compliance with local building codes<\/li>\n<\/ul>\n\n\n\n<p>Rather than treating mounting systems as simple accessories, project owners should view them as critical structural components that directly influence the safety and longevity of the entire PV system.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Six Factors to Consider When Choosing a Solar Mounting System<\/strong><strong><\/strong><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. Project Type<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>The first step is identifying the type of solar project.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Type<\/strong><strong><\/strong><\/td><td><strong>Recommended Mounting Solution<\/strong><strong><\/strong><\/td><\/tr><tr><td>Residential Rooftop<\/td><td>Roof mounting system<\/td><\/tr><tr><td>Commercial Rooftop<\/td><td>Aluminum rooftop system<\/td><\/tr><tr><td>Utility-scale Solar Farm<\/td><td>Steel ground mounting system<\/td><\/tr><tr><td>Solar Carport<\/td><td>Customized steel or aluminum structure<\/td><\/tr><tr><td>Agrivoltaics<\/td><td>Elevated ground mounting system<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Each application has different structural requirements, making project type the foundation of every mounting system design.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Roof Type or Ground Conditions<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>The installation surface determines both the mounting accessories and installation method.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Installation Surface<\/strong><strong><\/strong><\/td><td><strong>Common Mounting Solution<\/strong><strong><\/strong><\/td><\/tr><tr><td>Metal Roof<\/td><td>Rail system with roof clamps<\/td><\/tr><tr><td>Tile Roof<\/td><td>Roof hooks and aluminum rails<\/td><\/tr><tr><td>Flat Concrete Roof<\/td><td>Ballasted or anchored system<\/td><\/tr><tr><td>Open Ground<\/td><td>Pile-driven or concrete foundation<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Choosing a mounting system that matches the installation surface reduces installation complexity while improving long-term reliability.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3. Wind and Snow Loads<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Environmental conditions have a significant impact on structural design.<\/p>\n\n\n\n<p>Projects located in coastal regions, mountainous areas, or heavy snow zones require stronger mounting structures and additional reinforcement.<\/p>\n\n\n\n<p>Professional manufacturers design mounting systems according to internationally recognized engineering standards, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>ASCE 7<\/strong>\u00a0\u2014 Wind, snow, and seismic load requirements (United States)<\/li>\n\n\n\n<li><strong>EN 1991 (Eurocode 1)<\/strong>\u00a0\u2014 Structural loading standards in Europe<\/li>\n\n\n\n<li><strong>IBC (International Building Code)<\/strong>\u00a0where applicable<\/li>\n<\/ul>\n\n\n\n<p>Ignoring local environmental loads may increase the risk of structural failure during extreme weather conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Mounting Material<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>The two most common materials are aluminum and hot-dip galvanized steel.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Feature<\/strong><strong><\/strong><\/td><td><strong>Aluminum<\/strong><strong><\/strong><\/td><td><strong>Hot-Dip Galvanized Steel<\/strong><strong><\/strong><\/td><\/tr><tr><td>Weight<\/td><td>Light<\/td><td>Heavy<\/td><\/tr><tr><td>Corrosion Resistance<\/td><td>Excellent<\/td><td>Very Good<\/td><\/tr><tr><td>Structural Strength<\/td><td>High<\/td><td>Very High<\/td><\/tr><tr><td>Installation Speed<\/td><td>Faster<\/td><td>Moderate<\/td><\/tr><tr><td>Best Application<\/td><td>Rooftops<\/td><td>Ground-mounted projects<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Aluminum is generally preferred for rooftop projects because of its lightweight design and natural corrosion resistance.<\/p>\n\n\n\n<p>Steel remains the preferred option for utility-scale solar farms where maximum structural strength and lower material costs are the primary priorities.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>5. Corrosion Environment<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Not every project requires the same level of corrosion protection.<\/p>\n\n\n\n<p>For installations located near coastlines or in chemical industrial zones, corrosion-resistant materials become essential.<\/p>\n\n\n\n<p>Manufacturers typically provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Hot-dip galvanized steel<\/li>\n\n\n\n<li>Zinc-aluminum-magnesium steel<\/li>\n\n\n\n<li>Anodized aluminum<\/li>\n<\/ul>\n\n\n\n<p>Many products are tested according to <strong>ISO 9227 Salt Spray Testing<\/strong>, helping verify long-term corrosion resistance under aggressive environmental conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>6. Engineering Support<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Many buyers focus only on product price, but engineering services often determine whether a project is installed successfully.<\/p>\n\n\n\n<p>Professional suppliers should provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Structural calculations<\/li>\n\n\n\n<li>Layout optimization<\/li>\n\n\n\n<li>Foundation recommendations<\/li>\n\n\n\n<li>Installation drawings<\/li>\n\n\n\n<li>Bill of Materials (BOM)<\/li>\n\n\n\n<li>Technical support<\/li>\n<\/ul>\n\n\n\n<p>These engineering services can reduce installation errors while improving project efficiency.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Why Engineering Matters More Than Price<\/strong><strong><\/strong><\/h1>\n\n\n\n<p>The lowest quotation is not always the most economical choice.<\/p>\n\n\n\n<p>A poorly designed mounting system may require additional materials during installation, increasing labor costs and delaying project completion.<\/p>\n\n\n\n<p>At <strong><a href=\"https:\/\/alv-solar.com\"><mark class=\"has-inline-color has-vivid-green-cyan-color\">\u0410\u041b\u0412<\/mark><\/a><\/strong>, every project begins with an engineering evaluation rather than a standard price list. Our engineers analyze wind and snow loads, roof structure, project location, and module specifications before recommending the most suitable mounting solution.<\/p>\n\n\n\n<p>This engineering-first approach helps customers improve installation efficiency while reducing long-term maintenance costs and structural risks.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Common Mistakes When Choosing a Solar Mounting System<\/strong><strong><\/strong><\/h1>\n\n\n\n<p>Even experienced buyers sometimes focus on price alone when comparing suppliers. However, the lowest quotation does not always deliver the lowest lifecycle cost. Avoid these common mistakes when selecting a solar mounting system.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. Choosing Based Only on Price<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>A lower-priced mounting system may use thinner materials, lower-quality fasteners, or simplified structural designs. While the upfront investment may be lower, poor-quality components can increase maintenance costs and shorten the service life of the entire PV system.<\/p>\n\n\n\n<p>Instead of comparing prices alone, evaluate the total value of the solution, including engineering support, material quality, warranty, and installation efficiency.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Ignoring Local Environmental Conditions<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Wind speed, snow load, corrosion level, and seismic requirements vary significantly from one location to another.<\/p>\n\n\n\n<p>For example:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Coastal projects require higher corrosion resistance.<\/li>\n\n\n\n<li>High-altitude regions require stronger snow-load capacity.<\/li>\n\n\n\n<li>Hurricane-prone areas require reinforced structural designs.<\/li>\n<\/ul>\n\n\n\n<p>Selecting a standard mounting system without considering local conditions may result in unnecessary project risks.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3. Overlooking Engineering Services<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Engineering is often as important as the product itself.<\/p>\n\n\n\n<p>Professional suppliers should provide structural calculations, layout optimization, installation drawings, and technical recommendations that comply with local regulations.<\/p>\n\n\n\n<p>These services help reduce installation errors and improve construction efficiency.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>How to Evaluate a Solar Mounting System Supplier<\/strong><strong><\/strong><\/h1>\n\n\n\n<p>When comparing suppliers, consider more than manufacturing capability.<\/p>\n\n\n\n<p>The following checklist can help buyers make a more informed decision.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Evaluation Item<\/strong><strong><\/strong><\/td><td><strong>Why It Matters<\/strong><strong><\/strong><\/td><\/tr><tr><td>Engineering Capability<\/td><td>Ensures structural safety and optimized designs<\/td><\/tr><tr><td>Material Quality<\/td><td>Improves durability and reliability<\/td><\/tr><tr><td>Manufacturing Experience<\/td><td>Reduces production risks<\/td><\/tr><tr><td>Quality Control<\/td><td>Ensures consistent product performance<\/td><\/tr><tr><td>International Standards<\/td><td>Supports global project compliance<\/td><\/tr><tr><td>Delivery Capacity<\/td><td>Helps avoid project delays<\/td><\/tr><tr><td>Technical Support<\/td><td>Solves installation issues quickly<\/td><\/tr><tr><td>\u0413\u0430\u0440\u0430\u043d\u0442\u0438\u044f<\/td><td>Protects long-term investment<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>A reliable supplier should be able to provide both high-quality products and comprehensive engineering support throughout the project lifecycle.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Why More EPC Contractors Choose <a href=\"https:\/\/alv-solar.com\"><mark class=\"has-inline-color has-vivid-green-cyan-color\">\u0410\u041b\u0412<\/mark><\/a><\/strong><\/h1>\n\n\n\n<p>Choosing the right supplier is just as important as choosing the right mounting system.<\/p>\n\n\n\n<p>At <strong>\u0410\u041b\u0412<\/strong>, we work closely with EPC contractors, distributors, and project developers worldwide to deliver customized solar mounting solutions for residential, commercial, and utility-scale projects.<\/p>\n\n\n\n<p>Our services include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Customized mounting system design<\/li>\n\n\n\n<li>Structural calculations<\/li>\n\n\n\n<li>Wind and snow load analysis<\/li>\n\n\n\n<li>Layout optimization<\/li>\n\n\n\n<li>Product selection recommendations<\/li>\n\n\n\n<li>Installation guidance<\/li>\n\n\n\n<li>Technical support throughout the project<\/li>\n<\/ul>\n\n\n\n<p>Instead of offering one-size-fits-all products, <strong>\u0410\u041b\u0412<\/strong>&nbsp;develops solutions tailored to each project&#8217;s structural requirements and environmental conditions.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Frequently Asked Questions (FAQ)<\/strong><strong><\/strong><\/h1>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>1. What is the most important factor when choosing a solar mounting system?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>The most important factor is matching the mounting system to your project conditions, including roof type, installation location, environmental loads, and local building standards.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>2. Is aluminum always better than steel?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>No. Aluminum is generally preferred for rooftop installations because it is lightweight and corrosion-resistant, while steel is usually the better choice for utility-scale ground-mounted projects that require higher structural strength.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>3. How long should a solar mounting system last?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>A high-quality solar mounting system should have a design life of <strong>25\u201330 years or more<\/strong>, matching the expected lifespan of modern photovoltaic modules.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>4. Which engineering standards should a mounting system comply with?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Depending on the project location, manufacturers commonly design mounting systems according to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>ASCE7\u00a0<\/li>\n\n\n\n<li>EN 1991 (Eurocode 1)<\/li>\n\n\n\n<li>ISO 9227<\/li>\n\n\n\n<li>Applicable local building regulations<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>5. Does a higher price always mean better quality?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Not necessarily.<\/p>\n\n\n\n<p>Higher prices may reflect better materials, additional engineering services, or stronger quality control. Buyers should compare the overall value rather than focusing only on the purchase price.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>6. What information should I prepare before requesting a quotation?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>To receive an accurate quotation, prepare the following information:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project location<\/li>\n\n\n\n<li>Roof type or ground conditions<\/li>\n\n\n\n<li>Solar panel dimensions<\/li>\n\n\n\n<li>Installation angle<\/li>\n\n\n\n<li>Wind and snow load requirements<\/li>\n\n\n\n<li>Total project capacity<\/li>\n\n\n\n<li>Applicable local design standards<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>7. Can one mounting system fit every project?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>No.<\/p>\n\n\n\n<p>Different projects require different structural designs, materials, and installation methods. A customized solution is usually the best choice for maximizing safety and cost efficiency.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>8. Does ALV provide customized mounting solutions?<\/strong><strong><\/strong><\/h2>\n\n\n\n<p>Yes.<\/p>\n\n\n\n<p><strong>\u0410\u041b\u0412<\/strong>&nbsp;provides customized solar mounting systems based on project requirements, local environmental conditions, and international engineering standards. Our engineering team supports customers from design through installation.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Conclusion<\/strong><strong><\/strong><\/h1>\n\n\n\n<p>There is no universal solar mounting system that suits every project. The right choice depends on multiple factors, including project type, installation environment, structural requirements, and long-term operating costs.<\/p>\n\n\n\n<p>Rather than selecting a mounting system based only on price, buyers should evaluate the complete solution\u2014including engineering support, material quality, compliance with international standards, and supplier experience. A well-designed mounting system can improve installation efficiency, reduce maintenance costs, and enhance the long-term reliability of the entire PV system.<\/p>\n\n\n\n<p>As the global solar industry continues to expand, investing in a reliable mounting solution is an investment in the long-term success of your project.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Talk to <a href=\"https:\/\/alv-solar.com\"><mark class=\"has-inline-color has-vivid-green-cyan-color\">ALV&#8217;s Engineering Team<\/mark><\/a><\/strong><\/h2>\n\n\n\n<p>Every solar project is different.<\/p>\n\n\n\n<p>Instead of choosing a mounting system based only on price, let our engineers evaluate your project requirements and recommend the most suitable solution.<\/p>\n\n\n\n<p>We provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Free technical consultation<\/li>\n\n\n\n<li>Customized mounting design<\/li>\n\n\n\n<li>Structural calculations<\/li>\n\n\n\n<li>Fast quotations<\/li>\n\n\n\n<li>Global project support<\/li>\n<\/ul>\n\n\n\n<p><strong>Contact <a href=\"http:\/\/alv-solar.com\"><mark class=\"has-inline-color has-vivid-green-cyan-color\">\u0410\u041b\u0412<\/mark><\/a> today<\/strong>\u00a0to discuss your next solar project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img fetchpriority=\"high\" decoding=\"async\" width=\"919\" height=\"614\" src=\"https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image.png\" alt=\"\" class=\"wp-image-23351\" srcset=\"https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image.png 919w, https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image-400x267.png 400w, https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image-768x513.png 768w, https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image-18x12.png 18w, https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image-500x334.png 500w, https:\/\/alv-solar.com\/wp-content\/uploads\/2026\/08\/image-150x100.png 150w\" sizes=\"(max-width: 919px) 100vw, 919px\" \/><\/figure>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Last Updated:\u00a0August 3rd,2026 Author:\u00a0Devi Huang | International Sales Team, ALV Devi Huang is part of the international sales team at<\/p>","protected":false},"author":25,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[233],"tags":[],"class_list":["post-23349","post","type-post","status-publish","format-standard","hentry","category-solar-mounting-system"],"_links":{"self":[{"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/posts\/23349","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/comments?post=23349"}],"version-history":[{"count":2,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/posts\/23349\/revisions"}],"predecessor-version":[{"id":23358,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/posts\/23349\/revisions\/23358"}],"wp:attachment":[{"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/media?parent=23349"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/categories?post=23349"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/alv-solar.com\/ru\/wp-json\/wp\/v2\/tags?post=23349"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}